|
|
|
|
|
|
|
|
Dan Jones team installing steel panels Viewed: 201 times.
|
Dan drywalling the bathrooms Viewed: 202 times.
|
Bravo and the extraterrestrial orbs working under the stage Viewed: 199 times.
|
| | |
|
|
|
|
|
|
|
|
Dan Jones brought in a team to work on Zeke's (7/2) Viewed: 201 times.
|
Mike Kelso Viewed: 226 times.
|
Painter extraordinaire Viewed: 215 times.
|
| | |
|
|
|
|
|
|
|
|
Adriana pushes hard to drill holes in the railing. Viewed: 194 times.
|
Mark workin' hard at Zeke's. Viewed: 209 times.
|
Corinn lovin' the cleaning detail. (we've been invaded! Notice the mysterious orbs!!!) Viewed: 207 times.
|
| | |
|
|
|
|
|
|
|
|
Doug works on drywall under the stage. Viewed: 203 times.
|
Dan and Brooke clean carbon steel panels. Viewed: 195 times.
|
Putting in time to get Zeke's done. Viewed: 193 times.
|
| | |
|
|
|
|
|
|
|
|
A labor of love. Viewed: 182 times.
|
A view into the bathrooms Viewed: 201 times.
|
Austin manhandling drywall. Viewed: 193 times.
|
| | |
|
|
|
|
|
|
|
|
Getting the bathrooms drywalled. Viewed: 194 times.
|
Michael getting some electrical done. Viewed: 188 times.
|
Putting in a can light Viewed: 202 times.
|
| | |